Brown’s pier and beam repair method begins with securing the main girder beam with hydraulic jacks.
A solid support is built under each beam. A concrete beam is adjusted as the structure will allow using the Brown Method.
Deteriorated structural elements may require replacement throughout the process. Upon completion the structure is restored back to allowable tolerances and is safe.