The Brown Method
The Brown Method of foundation repair
is completed by excavating a small hole
exposing the perimeter beam of the structure. Then, a shaft is excavated
and concrete is poured at the base of
the shaft where we set rebar to
strengthen the pier. Once set, we
complete the concrete pour of the shaft yielding a solid, reinforced concrete pier.
This benefits the stability of the pier
being installed to stabilize your structure.
Then, eight pieces of rebar are used to form and stabilize a haunch. The footprint of the haunch is key to the success of our method. Once cured, we use a hydraulic jack to level the structure. A steel pipe is placed to secure the level position. The jack is removed and we install a sonitube and it is filled with concrete. Our installation method ensures the sonitube is cut to match the bottom of the beam cradling the beam.
We then backfill the area that was excavated and the installation is complete.
With The Brown Method, you get the benefits of steel reinforced concrete throughout the pier, supplying a solid structure and a large footprint on which the pier sits.